Product Name | Model Number |
I-Protect | SISIP4GH2101 |
I-Protect Advanced | xxxx |
Sys Infra R & D team efforts having in-house Hardware & Software development skills sets with continual customer feedback, real-time analysis this product could become what it is today, I-Protect truly designed & developed by sys Infra as a unique administrative & deterring tool for Decentralized Monitoring to ensure sites have least downtime and stay protected.
● Site monitoring Man less NOC for telecom Towers and associated sectors.
● Guaranteed ease of operation & operational cost optimization.
● SMS: messages sent to 3 individual levels assigned per installed location
● Mail: e-mails sent to the assigned levels
● Voice Messaging: dedicated dialler calls the assigned levels for alarms
● Mobile App: on-time status accessed through mobile and parameters adjusted
Self-customisable alarms: parameters can be set by user to receive set alarms
Self-Messaging: it sends messages on set parameters
Notice: self-generating noticing feature for critical conditions
● Web App: on-time status and data access through secure web login
● Passive downtime: accurate downtime data in hours and charts to get an overview
● Active downtime: accurate downtime data in hours and charts to get an overview
● Battery health status: mentioned as per set parameters as 3 conditions
Good: can be set from 100% to 90%
Moderate: can be set from 89% to 75%
Needs service: can be set from 74% and lower level
App based solution with real time updates.
In-House Development with R&D capability for future supports
Customised Electronic Hardware developed with Remote Access thru Mobile APP
In-house Developed & Upgraded in III Phases with customization
Future upgradable: as per site load and data needs cloud servers keep increasing resources
Dedicated or shared: there are provisions to implement dedicated servers or shared servers
Fast Access: the on-time access and reporting is instantaneous with a click
In house Developed Auto Dialler for event specific L-1,L-2 Calling.
Access to 200 Log file Data on App .More Available on demand.
Analysing data for symptoms of Battery or Cell Failure
Timely replacement will ensure better uptime of the whole site
Analysing data for wiring related issues, Pin point incorrectly wired or disconnected wiring, Incorrect wiring leads to faulty or no data
Fixing them will ensure early warning systems are in place
Site Automation is the heart of a healthy and productive site
Automation of the Site is analysed and detected if running in Manual mode
Such failure causes excessive fuel usage
Fixing this issue will decrease cost of running the site
BTS voltage is the main lifeline parameter of a healthy site
Analyse pattern associated with this parameter
Identifies weak sites that frequently reach dangerous levels of BTS voltage
Timely intervention on such sites can improve uptime
Theft Alarm Analysis
Analyse pattern associated with physical access of the Tower
Can flag if tower is used in unauthorised manner, High temperature can lead to failure of the site, Analyse pattern associated with temperature and flags if anything is of concern
Sr .NO. | Decentralized Site Monitoring & Theft Prevention | Resolution of issues responsible for downtime of sites | System Infra Compliance |
---|---|---|---|
1 | Theft | Theft Notification | Yes |
2 | Fire | Fire Notification | Yes |
3 | Temperature | Site Temperature Monitoring | Yes |
4 | Door | Door Status | Yes |
5 | Motion | Motion Detection | Yes |
6 | App Based Notification | Decentralized live site Monitoring | Yes |
7 | BTS Voltage | BTS Voltage Monitoring | Yes |
8 | Customized BTS Voltage Setting | To enable customized Setting of BTS Voltage | Yes |
9 | Requested to Add Additional Feature of Load /Battery LVD | To Prevent LVD setting from Technician | Yes |
10 | DG Run Hours Monitoring | To Display and Monitor Run hours of DG | Yes |
11 | EB Run Hours Monitoring | To Display and Monitor Run hours of EB | Yes |
12 | BB Run Hours Monitoring | To Display and Monitor Run hours of BB | Yes |
13 | App Modification | Advance version | Yes |
14 | Display Site Name with ID | Comprehensive View of Site Name & ID together | Yes |
15 | Auto Dial calls with site Name & ID under cases of theft, low voltage, door open, Fire etc. | To relate the call vs respective site name and Id for which it has been generated | Yes |
16 | Notify for communication failure from site in case of network down/internal battery drain/damage equipment/Unpaid SIMs | To notify the trespective In-Charge if I- Protect is not communicating for any reason to alert him for protection | Yes |
Site Down Due to multiple Failure | Advance Notification Developed As per site Feedback | ||
---|---|---|---|
SR. No | Notification Description | Demanded by clients | Complied by System Infra |
1 | Monitoring of BTS Live Voltage | Required | Yes |
2 | Live Temp monitoring | Required | Yes |
3 | Door Sensor Monitoring | Required | Yes |
4 | Fire Alarm monitoring | Required | Yes |
5 | DC Load Current Monitoring | Required | Yes |
6 | Alarm Tempering Monitoring | Required | Yes |
7 | Battery Life Status monitoring | Required | Yes |
8 | Battery Charging & Discharging Status monitoring | Required | Yes |
9 | Inside Shelter Movement status monitoring | Required | Yes |
10 | Load LVD Monitoring | Required | Yes |
11 | Battery LVD Monitoring | Required | Yes |
12 | LIVE Battery Run-Hour | Required | Yes |
13 | LIVE DG Run-Hour | Required | Yes |
14 | LIVE Mains Run-Hour | Required | Yes |
15 | LIVE- ALL Event Log File | Required | Yes |
16 | Real-time Notification | Required | Yes |
17 | Customized Auto-Real Time Dialer | Required | Yes |
SR. No | Site Name | Site ID | Duration | Week | Door Open | Motion | BTS Low ( less than 48vlt) | Less than (45vlt) | Theft | HRT more than 40vlt | Smoke |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | xxxx | xxxx | 3-March-20 to 10-March-20 | Week1 | 10 | 27 | 60 | 8 | 0 | 0 | 0 |
2 | 11-March-20 to 17-March-20 | Week2 | 52 | 61 | 43 | 0 | 0 | 0 | 0 | ||
3 | 18-March-20 to 24-March-20 | Week3 | 9 | 12 | 57 | 0 | 0 | 0 | 0 | ||
4 | 25-March-20 to 31-March-20 | Week4 | 9 | 8 | 46 | 0 | 0 | 0 | 0 | ||
5 | 9-Apr-20 to 15-Apr-20 | Week5 | 16 | 2 | 85 | 0 | 0 | 0 | 0 | ||
6 | 16-Apr-20 to 22-Apr-20 | Week6 | 7 | 11 | 98 | 6 | 0 | 0 | 0 | ||
7 | 23-Apr-20 to 29-Apr-20 | Week7 | 31 | 24 | 127 | 4 | 0 | 0 | 0 | ||
8 | 30-Apr-20 to 6-May-20 | Week8 | 24 | 36 | 69 | 0 | 0 | 0 | 0 | ||
9 | 07-Apr-20 to 15-May-20 | Week9 | 12 | 75 | 219 | 0 | 0 | 0 | 0 | ||
Total | 170 | 256 | 804 | 18 | 0 | 0 | 0 |
SR. No | Site Name | Site ID | Duration | Month | Door Open | Motion | BTS Low ( less than 48vlt) | Less than (45vlt) | Theft | HRT more than 40vlt | Smoke |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | xxxx | xxxx | Jan-20 | Jan-20 | 1733 | 2210 | 909 | 212 | 0 | 0 | 0 |
2 | Feb-20 | Feb-20 | 8514 | 9419 | 309 | 129 | 0 | 0 | 0 | ||
3 | Mar-20 | Mar-20 | 8322 | 3072 | 1653 | 96 | 0 | 0 | 0 | ||
4 | Apr-20 | Apr-20 | 2808 | 910 | 348 | 8 | 0 | 0 | 0 | ||
Total | 21377 | 15611 | 3219 | 445 | 0 | 0 | 0 |